新2网址大全:GCAP completes 309.28 KWp solar PV systems

频道:社会 日期: 浏览:4

新2网址大全www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

G Capital Bhd executive director Datuk Yap Yee Ping

KUALA LUMPUR: G Capital Bhd’s (GCAP) 70%-owned subsidiary, Solarcity Malaysia Sdn Bhd has completed the installation and commenced operation of a 309.28 KWp Solar Photovoltaic electric power generation system (Solar PV System).

The solar PV is for the supplemental power purchase agreement (PPA) with Muda Paper Converting Sdn Bhd, a wholly-owned subsidiary of Muda Holdings Bhd inked on May 30.

,

皇冠信用盘开户www.hg108.vip)是皇冠信用盘官方正网线上开放会员开户、代理开户,额度自动充值等业务的直营平台。

,

"I’m pleased to witness the completion and commissioning of 309.28 KWp add-on to Muda Paper Converting. All these small yet crucial delivery of promises will help Malaysia in reaching the target set in Renewable Energy Transition Roadmap 2035,” executive director Datuk Yap Yee Ping said in a statement.

The plant will be contributing revenue and earnings to GCAP over a span of 25 years from Aug 19, 2022, the commercial operation date.

“With the completion of the 309.28 KWp solar PV systems in Simpang Ampat, this brings our total installed solar PV systems capacity to 15.6MWp inception-to-date,” Yap said.


转载说明:本文转载自Sunbet。

0 留言

评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。
验证码